ENSTAR work will shift to Alumni Drive starting Thursday, August 1. This work will include excavation along the north side of Alumni Drive between East Campus Central Lot and the East Parking Garage. This work is not expected to impact the traffic lanes of Alumni Drive. There will be intermittent impact to adjacent pathways.
intro text
This blog is intended to provide easy access to information about maintenance and construction activities that are occurring around campus. Blog posts will primarily be focused on notices, outages, and disruptions; however, we will also include notable information about activities of interest to the campus community.
We encourage you to check back frequently! Please bookmark, subscribe to our RSS feed, or follow us by email (box on the right).
If you have any questions, please email us at: facilities@uaa.alaska.edu.
Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts
Tuesday, July 30, 2019
Wednesday, July 24, 2019
ENSTAR: Partial Closures of Spirit Drive
Spirit Drive will experience two partial closures related to the ENSTAR Gas Line project:
On Saturday, July 27 - Spirit Drive will be closed at Seawolf Drive. This is a one-day closure. South Lot, Seawolf Sports Complex, Student Union, Bookstore, and Engineering and Industry Buildings will all remain accessible via the Providence Drive and Spirit Intersection. See the graphic below for more detail.
Beginning Monday, July 29 - ENSTAR will begin trenching along the length of Spirit Drive. This work will close the west-bound lane. The east-bound lane will remain open. ENSTAR will conduct this work in sections, so pedestrian access from South Lot to the buildings will be maintained. South Lot, Seawolf Sports Complex, Student Union, Bookstore, and Engineering and Industry Buildings will all remain accessible via the Seawolf Drive and Spirit Intersection. See the graphic below for more detail. This portion of the work is expected to last one week.
Beginning Monday, July 29:
On Saturday, July 27 - Spirit Drive will be closed at Seawolf Drive. This is a one-day closure. South Lot, Seawolf Sports Complex, Student Union, Bookstore, and Engineering and Industry Buildings will all remain accessible via the Providence Drive and Spirit Intersection. See the graphic below for more detail.
Beginning Monday, July 29 - ENSTAR will begin trenching along the length of Spirit Drive. This work will close the west-bound lane. The east-bound lane will remain open. ENSTAR will conduct this work in sections, so pedestrian access from South Lot to the buildings will be maintained. South Lot, Seawolf Sports Complex, Student Union, Bookstore, and Engineering and Industry Buildings will all remain accessible via the Seawolf Drive and Spirit Intersection. See the graphic below for more detail. This portion of the work is expected to last one week.
Saturday, July 27:
Beginning Monday, July 29:
Friday, July 12, 2019
ENSTAR Gas Line Replacement
Beginning Monday, July 15, ENSTAR Natural Gas will begin work to replace campus gas infrastructure on central and east campus. Activity will include a combination of trenching and boring. The project is expected to be complete my mid-August.
During the week of July 15th crews will begin staging materials and begin drilling activities to install the lines in the Seawolf Drive and Spirit Drive areas. Please be aware of equipment and crews working in these areas.
Monday, December 17, 2018
MOA: Alumni Drive Closure at Providence Drive, December 19 and 20
On Wednesday, December 19 to Thursday, December 20 Alumni Drive will be closed at Providence Drive. This closure is so the Municipality of Anchorage and their contractor, Bristol, can replace the street light poles on the north side of the intersection. This is a continuation of their project to expanded the bus stop.
East Campus will remain accessible via the intersection at Alumni Drive and UAA Drive.
East Campus will remain accessible via the intersection at Alumni Drive and UAA Drive.
Wednesday, June 20, 2018
Municipality Road Closure at Alumni and Providence Continuing to July 3
The current partial intersection closure at Alumni Drive and Providence Drive is expected to continue for an addition two weeks - until July 3.
As a reminder, This closure is related to the Municipality of Anchorage's bus stop expansion project.
As a reminder, This closure is related to the Municipality of Anchorage's bus stop expansion project.
Thursday, June 14, 2018
June 18-25 Alumni Drive Closure Between Arts and Admin
Beginning Monday, June 18 and continuing for approximately 1 week Alumni Drive will be closed between the Fine Arts Building and the Administration/Humanities Building. This closure is to replace deteriorated storm drains.
Both Arts and Admin will remain accessible; however, due to the Municipality's transit project, vehicles will need to detour through the Library parking lot to access Admin. See the detour map below.
Both Arts and Admin will remain accessible; however, due to the Municipality's transit project, vehicles will need to detour through the Library parking lot to access Admin. See the detour map below.
Thursday, June 7, 2018
[UPDATED] Bookstore Plaza closed starting week of June 18 for roofing project
Beginning the week of June 18 the Bookstore Plaza and portions of South Lot will be closed due to a roofing project. Access to the Bookstore and Student Union will be maintained via an adjacent pathway. See the map below for the building access detour. We expect the roofing project to be completed by late July.
Thursday, May 24, 2018
Traffic Impacts at Alumni Drive and Providence Drive
Beginning Tuesday, May 29 the intersection at Alumni Drive and Providence Drive will experience a partial closure. During this closure Providence will not be accessible from Alumni. East Campus access will be from the intersection at UAA Drive and Alumni Drive. The closure will last for approximately 3 weeks.
Pedestrians, please follow detour signs in the area.
This closure is related to the Municipality of Anchorage's bus stop expansion project.
Pedestrians, please follow detour signs in the area.
This closure is related to the Municipality of Anchorage's bus stop expansion project.
Tuesday, May 15, 2018
MOA People Mover Bus Stop Expansion
This summer the Municipality of Anchorage (MOA) will be expanding the People Mover bus stop located near Alumni Drive and Providence Drive - just off the Library Plaza. This area will experience significant impacts for the duration of the project, including: partial intersection closures and pedestrian rerouting.
MOA's contractor will begin Wednesday, May 16th, as they begin establishing a new, temporary bus.
Starting the week of May 20th, the contractor will begin work within the existing bus stop area.
Please be aware of personnel and equipment operating in the area, and potential lane restrictions.
MOA's contractor will begin Wednesday, May 16th, as they begin establishing a new, temporary bus.
Starting the week of May 20th, the contractor will begin work within the existing bus stop area.
Please be aware of personnel and equipment operating in the area, and potential lane restrictions.
East Campus Pedestrian Detours
East Campus between UAA Drive and Alumni Drive will have a significant amount of construction activity this summer. Pedestrian flow through the area will be impacted.
Projects in this area include:
Projects in this area include:
- The closure of Central Garage
- Partial renovation of the Library
- Municipality of Anchorage expansion of the People Mover bus stop
The most significant impact will be access to the Library. For the summer the Library can only be accessed via the north entrance. From the SSB you must walk around the exterior of the library via the Library Plaza and the sidewalk adjacent to the parking lot.
Please follow detour signs and be aware of equipment and personnel operating in the area.
Thursday, May 3, 2018
Summer Construction Impacts to Parking and Trails
A number of upcoming maintenance and construction projects will limit availability of parking in and around central UAA campus between May 7, 2018 and approximately August 14, 2018.
The largest impact will be the closure of the Central Parking Garage (CPG) and a portion of the adjacent East Campus Central Lot from May 7 to August 10. This summer closure will allow completion of multiple projects simultaneously. These projects include upgrades and updates to lighting, drainage, garage decks, stairwells, and finishes to improve visibility and navigability. This project will impact pedestrian traffic between west and east campus. The detour route will be from 2nd floor NSB through the CPG section of the spine to 2nd floor SSB - see the map below for additional information.
North Library Lot will be unavailable from May 7 to August 17 to facilitate work on the HVAC and old mechanical systems within the Library.
Portions of Library Lot closest Providence Drive will be impacted by a Municipal project that will also affect westbound traffic flow and pedestrian routes from May 14 to August 17. Watch for signs to redirect pedestrian traffic coming from UAA Housing and trails.
Portions of West Lot near Providence Drive and potentially South Lot near the Bookstore will be unavailable intermittently between June 1 to August 3 to allow for roof replacement and project staging.
Event requests for summer parking accommodation (groups, waivers, should be submitted at the UAA Parking Services web page, use the FORMS button. If you witness unsafe conditions, please report to: 786-6980
Thank you for your understanding as we work to improve campus conditions for you. Please direct parking questions to UAA Parking Services 786-1119 and Facilities questions to 786-1346
The largest impact will be the closure of the Central Parking Garage (CPG) and a portion of the adjacent East Campus Central Lot from May 7 to August 10. This summer closure will allow completion of multiple projects simultaneously. These projects include upgrades and updates to lighting, drainage, garage decks, stairwells, and finishes to improve visibility and navigability. This project will impact pedestrian traffic between west and east campus. The detour route will be from 2nd floor NSB through the CPG section of the spine to 2nd floor SSB - see the map below for additional information.
North Library Lot will be unavailable from May 7 to August 17 to facilitate work on the HVAC and old mechanical systems within the Library.
Portions of Library Lot closest Providence Drive will be impacted by a Municipal project that will also affect westbound traffic flow and pedestrian routes from May 14 to August 17. Watch for signs to redirect pedestrian traffic coming from UAA Housing and trails.
Portions of West Lot near Providence Drive and potentially South Lot near the Bookstore will be unavailable intermittently between June 1 to August 3 to allow for roof replacement and project staging.
Event requests for summer parking accommodation (groups, waivers, should be submitted at the UAA Parking Services web page, use the FORMS button. If you witness unsafe conditions, please report to: 786-6980
Thank you for your understanding as we work to improve campus conditions for you. Please direct parking questions to UAA Parking Services 786-1119 and Facilities questions to 786-1346
![]() |
| Pedestrian Detour Route |
![]() |
| Available parking for Summer 2018 |
Wednesday, April 11, 2018
2018 Summer Construction and Heavy Maintenance Map
The 2018 Summer Construction and Heavy Maintenance Activities map has been released. The map will be updated as needed over the summer. Project-specific notifications will be posted separately.
Click for a larger version
Click for a larger version
Thursday, March 29, 2018
[UPDATED] Tree Clearing April 7-8 at Alumni and Providence
Beginning Saturday, April 7 tree clearing activity will occur in the wooded area at the north-west corner of intersection at Alumni Drive and Providence Drive (see map below). This activity is expected to last through the weekend
The right-hand lane of Alumni Drive - closest to the activity - will be closed during this time. The campus community is encouraged to exit east campus at UAA Drive. Pedestrians should be attentive to potential detours.
The tree clearing is associated with a Municipality of Anchorage project to expand the bus stop next to the Library Plaza and improve pedestrian flow in the area.
The right-hand lane of Alumni Drive - closest to the activity - will be closed during this time. The campus community is encouraged to exit east campus at UAA Drive. Pedestrians should be attentive to potential detours.
The tree clearing is associated with a Municipality of Anchorage project to expand the bus stop next to the Library Plaza and improve pedestrian flow in the area.
Wednesday, August 9, 2017
Updated Pedestrian Detour for South Lot Repair Work
There has been a change to the pedestrian access route for EIB and ANSEP around the repair work in South Parking Lot. Due to adjacent utility work in Providence Drive the previously announced pedestrian detour route for access to EIB and ANSEP will be unavailable. Pedestrian access to the EIB and ANSEP will now be along Spirit Dr. See the map below.
Expect a significant presence of large truck traffic entering and leaving the South Lot as a result of the EIB walkway and parking lot project. Caution should be taken when walking to/from your vehicles in this area, especially when near the site fence access gates. Please do not enter or walk through the active construction area.
Expect a significant presence of large truck traffic entering and leaving the South Lot as a result of the EIB walkway and parking lot project. Caution should be taken when walking to/from your vehicles in this area, especially when near the site fence access gates. Please do not enter or walk through the active construction area.
Monday, July 31, 2017
South Lot and EIB Sidewalk Repairs, August 1 to August 25
On August 1 Neeser Construction will start repairs to the South Lot and sidewalk adjacent to the Engineering and Industry Building. They are expected to complete the work by August 25. See the map below for the anticipated impacts to the South Parking Lot and west EIB sidewalk.
The main entry to the EIB will be closed. Pedestrian traffic going to/from South Parking Lot will be directed to the sidewalk south of EIB. Additionally, the Pay-&-Park will be unavailable during this time.
The main entry to the EIB will be closed. Pedestrian traffic going to/from South Parking Lot will be directed to the sidewalk south of EIB. Additionally, the Pay-&-Park will be unavailable during this time.
Thursday, May 18, 2017
Natural Sciences Building Heating and Cooling Project
Work is underway this summer to install heating and cooling systems in the Natural Sciences Building. The heating and cooling for the building is presently served by a utility building across the East Campus Central Lot. The impacted area includes the wooded area north of the building and a section of the East Campus Central Lot. Work will include installation of boilers and drilling a cooling well in the wooded area north of the building.
Due to the impacted area, the pathway on the north side of the building will be closed. Pedestrians using the exterior paths should utilize the pathway along Providence Drive.
The Natural Sciences Building will remain accessible during construction. The interior pathway through the spine will be maintained.
Due to the impacted area, the pathway on the north side of the building will be closed. Pedestrians using the exterior paths should utilize the pathway along Providence Drive.
The Natural Sciences Building will remain accessible during construction. The interior pathway through the spine will be maintained.
Labels:
Construction,
Notice
Location:
3150 UAA Dr, Anchorage, AK 99508, USA
Wednesday, October 12, 2016
Alumni Loop Lane Restrictions for Oct 15th and 16th.
Alumni Loop will be restricted to a single lane this
weekend, Oct 15th and 16th. Contractors will be making repairs to the
underground infrastructure. Access will be available but expect delays as
flaggers are directing traffic. Any questions, please contact Facilities
Planning and Construction at 786-4900 or uaa_fpc@uaa.alaska.edu
Wednesday, September 7, 2016
EIB Sidewalk and Lot Closure
Contractors will be working on a pedestrian fence along a portion of the EIB/South lot boundary. To facilitate this work a portion of the adjacent South Parking Lot and surrounding sidewalks will be closed from Friday (9/9) to Tuesday (9/13) Morning (7-10am).
Wednesday, May 4, 2016
Engineering Building Atrium Closed, May 9 to Fall 2016
Beginning Monday, May 9th the atrium of the Engineering Building will be closed for renovation. The atrium will remain closed through the summer and will reopen for the fall semester.
The spine will remain open and people must utilize the stairwell and elevator in the spine tower to transfer between floors. Signage will be placed in the area to direct people.
The spine will remain open and people must utilize the stairwell and elevator in the spine tower to transfer between floors. Signage will be placed in the area to direct people.
Subscribe to: